SCP were appointed by Egis on behalf of UK Highways Ltd and Highways England to carry out the detailed design for 10 safety schemes on the M40 DBFO Motorway.

Concept safety improvement proposals were developed into approved detailed designs.

The schemes addressed known collision sites and also at locations where drivers were at risk of travelling the wrong way down the M40 through the design of a package of improvement measures. These included various highway improvements at 10 locations along the route from J1 to J14.

SCP managed and delivered Road Safety Audits for all the of sites at design approvals (Stage 1/2) and post completion (Stage 3).

The works were substantially completed in February and March 2020 by Egis and are now delivering road safety improvements on the Motorway network.